Backfilling of Storage Yard

We successfully completed the construction of a robust storage yard in Manatek, Qatar, utilizing 10,230 cubic meters of high-quality backfilling materials. The yard was meticulously prepared and leveled to provide a stable foundation for various storage needs. Our team carefully compacted the backfill to ensure its stability and durability, making the yard suitable for storing heavy equipment and materials. The project involved the excavation of the site, the placement of the backfill materials, and the careful compaction of the soil. We adhered to strict quality control standards throughout the construction process, ensuring that the yard met the highest safety and durability requirements. The successful completion of this project provided a valuable asset for the client, expanding their storage capacity and enabling them to efficiently manage their operations.

Challenge 😞

Ensuring the stability and durability of the backfill material in a challenging environment with varying soil conditions.

Solution 😃

Conducted thorough soil testing to assess the site's characteristics and select appropriate backfill materials. Employed proper compaction techniques to achieve optimal density and stability.

Challenge 😞

Minimizing environmental impact and preventing erosion during the backfilling process.

Solution 😃

Implemented erosion control measures, such as silt fences and temporary vegetation, to protect surrounding areas from sediment runoff.