cable pulling project for the
Building Management System (BMS)

Our team successfully executed a comprehensive cable pulling project for the Building Management System (BMS) at the National Museum of Qatar. We meticulously installed and terminated cables, ensuring seamless integration with the museum's existing infrastructure. Our skilled technicians navigated complex pathways, carefully routed cables through conduits and chases, and precisely connected them to the DDC Panel. We prioritized safety and efficiency throughout the project, adhering to strict industry standards and utilizing advanced cable pulling techniques. The successful completion of this project contributed to the reliable and efficient operation of the BMS, enhancing the overall visitor experience and museum management.

Challenge 😞

Navigating the complex building infrastructure, which presented challenges due to limited access and tight spaces.

Solution 😃

Employed advanced cable pulling techniques, such as micro-pulling and winching, to maneuver cables through confined areas. Utilized specialized tools and equipment to minimize disruptions to building operations.

Challenge 😞

Ensuring precise alignment and termination of cables to prevent system errors and malfunctions.

Solution 😃

Adhered to strict quality control standards, implemented rigorous testing procedures, and utilized advanced cable termination tools to guarantee accurate connections.